PM-02
Turns a SAP work centre into a PM department and designation, so an ingested order reaches the right pool by itself.
Put the work centres in the order the work runs: 1st, 2nd, 3rd, to the end of the line. Mark what runs alongside, what is off the line, and when each stage hands over to the next.
No flow is set for Sponge DRI yet. Add work centres below in the order they run, or start from the register order.
Nothing yet. Add from the list on the right.
Set the steps and the rules appear here.
Saved in this browser (demo). Nothing is sent to SAP or written to the plant's records.
Sections come from the Sponge organisation charts; areas from each plant's asset register. The client files carry no SAP work-centre codes, so none is invented: an area is the unit orders will map to.
| Name | Kind | Plant | Department | Head | Machines / people |
|---|---|---|---|---|---|
| Sponge DRI plant (SID) | Section | Sponge DRI | Plant Head | S.K.Kesharwani | 1 named |
| Kiln-1 | Section | Sponge DRI | Operation | J.P. Sahu | 40 named |
| Kiln-2 | Section | Sponge DRI | Operation | J.P. Sahu | 40 named |
| Kiln 3-4 | Section | Sponge DRI | Operation | J.P. Sahu | 40 named |
| Mis | Section | Sponge DRI | Operation | J.P. Sahu | 40 named |
| Field operation | Section | Sponge DRI | Operation | J.P. Sahu | 40 named |
| Unit I - Kiln-1, 132 KV Sub-station, Utility | Section | Sponge DRI | Electrical | Animesh Tiwari | 35 named |
| Unit II - Kiln-2,3,4, Iron Ore Crushing Plant, DG | Section | Sponge DRI | Electrical | Animesh Tiwari | 35 named |
| Weigh Bridge & EPABX | Section | Sponge DRI | Electrical | Animesh Tiwari | 35 named |
| Utilities & Preventive Maintenance | Section | Sponge DRI | Electrical | Animesh Tiwari | 35 named |
| DRI Unit-1 (Kiln-1) | Section | Sponge DRI | Mechanical | L.K.Kaushik (Sr Mgr) / Amit Singh (AGM) | 37 named |
| DRI Unit-2 (Kiln-2, 3 & 4) | Section | Sponge DRI | Mechanical | L.K.Kaushik (Sr Mgr) / Amit Singh (AGM) | 37 named |
| Drawing Section | Section | Sponge DRI | Mechanical | L.K.Kaushik (Sr Mgr) / Amit Singh (AGM) | 37 named |
| ISO/MIS/Documentation (vacant) | Section | Sponge DRI | Mechanical | L.K.Kaushik (Sr Mgr) / Amit Singh (AGM) | 37 named |
| Preventive Maintenance | Section | Sponge DRI | Mechanical | L.K.Kaushik (Sr Mgr) / Amit Singh (AGM) | 37 named |
| Spare Parts & Utility Maint | Section | Sponge DRI | Mechanical | L.K.Kaushik (Sr Mgr) / Amit Singh (AGM) | 37 named |
| RMP Operation | Section | Sponge DRI | RMP | Mohan Lal Verma | 25 named |
| RMP Maintenance | Section | Sponge DRI | RMP | Mohan Lal Verma | 25 named |
| Vehicle (drivers/operators) | Section | Sponge DRI | RMP | Mohan Lal Verma | 25 named |
| Coal & Iron circuits | Section | Sponge DRI | RMP | Mohan Lal Verma | 25 named |
| Yard | Section | Sponge DRI | RMP | Mohan Lal Verma | 25 named |
| Kiln 2 (Kiln & Cooler 02, 350 TPD line) | Area | Sponge DRI | Mechanical | - | 51 machines |
| Kiln 3 (Kiln & Cooler 03, 100 TPD line) | Area | Sponge DRI | Mechanical | - | 43 machines |
| Kiln 4 (Kiln & Cooler 04, 100 TPD line) | Area | Sponge DRI | Mechanical | - | 43 machines |
| Kilns 3 & 4 (shared utilities) | Area | Sponge DRI | Mechanical | - | 5 machines |
| PSB (350 TPD) | Area | Sponge DRI | Mechanical | - | 26 machines |
| PSB (100 TPD) | Area | Sponge DRI | Mechanical | - | 7 machines |
| Bag house / dedusting | Area | Sponge DRI | Mechanical | - | 7 machines |
| Water pumps (common) | Area | Sponge DRI | Mechanical | - | 16 machines |
| Centrifugal Water Cooling Pump Motors | Area | Ferro Alloy | Electrical & Instrumentation | - | 8 machines |
| Master List: Equipments Resources | Area | Ferro Alloy | Electrical & Instrumentation | - | 32 machines |
| Cooling Tower Motors | Area | Ferro Alloy | Electrical & Instrumentation | - | 4 machines |
| Hydraulic Motors | Area | Ferro Alloy | Electrical & Instrumentation | - | 8 machines |
| Belt Conveyor System | Area | Ferro Alloy | Electrical & Instrumentation | - | 8 machines |
| Skip Hoist | Area | Ferro Alloy | Electrical & Instrumentation | - | 4 machines |
| EOT Cranes | Area | Ferro Alloy | Electrical & Instrumentation | - | 21 machines |
| Purging, RAV Motors, Dust Conveyor & ID Fan | Area | Ferro Alloy | Electrical & Instrumentation | - | 61 machines |
| Compressors | Area | Ferro Alloy | Electrical & Instrumentation | - | 5 machines |
| Miscellaneous | Area | Ferro Alloy | Electrical & Instrumentation | - | 22 machines |
| Settling Tank Motors | Area | Ferro Alloy | Electrical & Instrumentation | - | 3 machines |
| Master List: Transformer Oiltesting Reports & Equipment Calibration | Area | Ferro Alloy | Electrical & Instrumentation | - | 7 machines |
| Furnace and Aux. Transformers | Area | Ferro Alloy | Electrical & Instrumentation | - | 7 machines |
| Master List: Control Panel & Rtcc Panel | Area | Ferro Alloy | Electrical & Instrumentation | - | 8 machines |
| Electrode Blower Motors | Area | Ferro Alloy | Electrical & Instrumentation | - | 3 machines |
| MASTER LIST: Electrode, Mental & Smoke seal Air Blower | Area | Ferro Alloy | Electrical & Instrumentation | - | 2 machines |
| Mantle Blower Motors | Area | Ferro Alloy | Electrical & Instrumentation | - | 4 machines |
| Smoke Seal Air Blower Motors | Area | Ferro Alloy | Electrical & Instrumentation | - | 4 machines |
| MASTER LIST: 11 kV Breakers | Area | Ferro Alloy | Electrical & Instrumentation | - | 9 machines |
| Telfer Motors and Starters | Area | Ferro Alloy | Electrical & Instrumentation | - | 4 machines |
| MCC's | Area | Ferro Alloy | Electrical & Instrumentation | - | 7 machines |