What each role may do and how far it reaches — read from the stored matrix, for the access review.
Who owns, approves, executes or verifies each task. Role-level, not tied to named people.
| Task | HOD (Division) | HOD (MECH) | MGR / Dy. MGR | ASST. MGR/SR. ENGG/ ENGG. | FOREMAN | TECHNICIAN |
|---|---|---|---|---|---|---|
| Daily equipment inspection | I | CVAI | P | E | ES | S |
| Shutdown Maintenance | ACI | CVI | P | E | S | S |
| Breakdown Maintenance | ACI | CVI | P | E | S | S |
| Preventive Maintenance of equipment | I | ICV | P | E | S | S |
| IMS (Documentation and related work) | I | ACV | P | E | S | S |
From the SMS maintenance structure.
GM-SMS
Management
Incharge - Mechanical
Mechanical
Incharge - Electrical
Electrical
Shift-Incharge (Mechanical)
Mechanical
Shift-Incharge (Electrical)
Electrical
Sr. Technician - Fitter
Mechanical
Foreman / Sr. Technician / Technician (Electrical)
Electrical
Sr. Technician - Welder
Mechanical
Contractor Tech/Helper (Electrical)
Electrical
Sr. Operator - Pump
Mechanical
Contractor Tech/Helper (Mechanical)
Mechanical
Level 1 is the plant head, 5 a technician; head-count against vacancies.
| Designation | Level | Departments | Grades | Filled | Vacant |
|---|---|---|---|---|---|
| Head Sponge (GM SID) | 1 | Plant Head | GM | 1 | 0 |
| Head (E & I) | 2 | Electrical | - | 1 | 0 |
| Head Operation (DGM - Sponge) | 2 | Operation | DGM | 1 | 0 |
| RMP Section Head | 2 | RMP | Sr.Manager | 1 | 0 |
| Section Incharge - Mechanical (DRI Unit-1) | 2 | Mechanical | Sr Mgr | 1 | 0 |
| Section Incharge - Mechanical (DRI Unit-2) | 2 | Mechanical | AGM | 1 | 0 |
| Preventive Maintenance Incharge | 3 | Mechanical | Deputy Mgr., Mgr | 2 | 0 |
| Drawing Section Incharge | 3 | Mechanical | Mgr | 1 | 0 |
| Electrical Section Incharge | 3 | Electrical | - | 1 | 1 |
| Kiln Incharge (Kiln 3-4) | 3 | Operation | - | 1 | 0 |
| Kiln Incharge (Kiln-1) | 3 | Operation | - | 1 | 0 |
| Kiln Incharge (Kiln-2) | 3 | Operation | - | 1 | 0 |
| RMP Maintenance In-charge | 3 | RMP | - | 1 | 0 |
| RMP Operation In-charge | 3 | RMP | - | 1 | 0 |
| ISO, MIS, Data Analysis & Documentation (in-charge) | 3 | Mechanical | - | 0 | 1 |
| Kiln Incharge (vacant box) | 3 | Operation | - | 0 | 1 |
| Spare Parts & Utility Maint Incharge (Kiln 1) | 3 | Mechanical | - | 0 | 1 |
| Spare Parts & Utility Maint Incharge (Kiln 2,3 & 4) | 3 | Mechanical | - | 0 | 1 |
| Shift Incharge | 4 | Electrical, Mechanical, Operation | A.M., AM, AM., Er., Sr. Er., Sr.Er, Sr.Er. | 24 | 0 |
| Shift Engineer | 4 | Electrical | - | 5 | 2 |
| Shift Incharge (RMP Maintenance) | 4 | RMP | - | 4 | 0 |
| Shift Supervisor | 4 | RMP | - | 3 | 1 |
| Engineer (RMP, Crushing Plant & DG) | 4 | Electrical | - | 2 | 0 |
| Field Supervisor | 4 | Operation | - | 2 | 0 |
| MIS (DRI) | 4 | Operation | - | 1 | 0 |
| Utilities & Preventive Maintenance Engineer | 4 | Electrical | - | 1 | 0 |
| W.B. & EPABX System Engineer | 4 | Electrical | - | 1 | 0 |
| Fitter | 5 | Mechanical | Astt. Fitter, Fitter, Foreman, Foremen, Sr. Fitter, Sr.Fitter | 14 | 0 |
| Control Room Operator (CRO) | 5 | Operation | - | 13 | 0 |
| Shift Technician | 5 | Electrical | - | 12 | 4 |
| Field Worker / Operator | 5 | Operation | - | 8 | 0 |
| Coal Circuit Operator (Kiln-I) | 5 | RMP | - | 7 | 0 |
| Maintenance Worker | 5 | RMP | - | 6 | 0 |
| Welder | 5 | Mechanical | Foreman, Sr. Welder, Sr.Foremen | 6 | 0 |
| Utility & Preventive Maintenance Technician | 5 | Electrical | - | 4 | 0 |
| Yard Supervisor (RMP-1 & 2 material reconciliation) | 5 | RMP | - | 4 | 0 |
| Technician (RMP, Crushing Plant & DG) | 5 | Electrical | - | 2 | 0 |
| Weigh Bridge & EPABX Technician | 5 | Electrical | - | 2 | 0 |
| Astt. Fitter | 5 | Mechanical | - | 1 | 0 |
| Belt Jointer | 5 | Mechanical | Fitter | 1 | 0 |
| Belt jointer | 5 | Mechanical | Sr Fitter | 1 | 0 |
| Rigger | 5 | Mechanical | - | 1 | 0 |
| Technician Dedusting & Ckt Operator / Astt. Fitter (vacant / contractor slot) | 5 | Mechanical | - | 0 | 0 |
| Technician Fitter (vacant / contractor slot) | 5 | Mechanical | - | 0 | 0 |
| Technician Pump Operator & C.O. (Astt. Fitter) (vacant / contractor slot) | 5 | Mechanical | - | 0 | 0 |
| Technician Pump Operator / Astt. Fitter (vacant / contractor slot) | 5 | Mechanical | - | 0 | 0 |
| Technician Rigger (vacant / contractor slot) | 5 | Mechanical | - | 0 | 0 |
| Technician Welder (vacant / contractor slot) | 5 | Mechanical | - | 0 | 0 |
| Workman (vacant / contractor slot) | 5 | Mechanical | - | 0 | 0 |