Reports
JSW ISPL Raipur · Last 30 days, 12 Oct 2026 to 10 Nov 2026
On-time compliance
81.7%
82%Done incl. late
89.5%
90%Checks due
2,188
dated before today; 79 more open today and aheadMissed
230
170 more done lateDeviations (NOK)
192
9.8 per 100 checks doneOn-time share of the checks that fell due each day, last 30 days.
NOK and out-of-range readings recorded on the checks done each day.
Ranked on on-time share; ties go to the one with more checks. At least 5 checks due to be ranked (22 areas qualify).
Each plant row is the sum of its areas' checks, never an average of their percentages. Due counts the checks dated before today (the Checks due figure above); Open counts those dated today or later.