Client data · JSW ISPL Raipur: The breakdown sheets the four plants sent, and escalations raised from them, not the live breakdown log (Preview mode: figures computed from client files.).Demo data: Figures the client's files do not carry are filled with representative demo values, the same on every visit, so the screen reads complete. They are not the plant's records.
Logged, escalated, owned, worked, closed. Each step links to the next.
All records, 01 Oct 2024 to 10 Nov 2026Failures only; 18 planned / modification jobs shown apart
Number of breakdowns recorded in the period. Formula: count of breakdowns with start in the period. Over the selected period. Source: PM-16.
Downtime
52.3h
All records, 01 Oct 2024 to 10 Nov 202661 of 164 failures recorded a duration
Total hours equipment was down through breakdowns in the period. Formula: sum of breakdown durations. Over the selected period. Source: PM-16.
MTTR
0.9h
All records, 01 Oct 2024 to 10 Nov 2026Over the 61 failures with a duration; 103 not recorded
Mean time to repair: average length of a breakdown over the period. Formula: total breakdown repair time ÷ number of breakdowns. Over the selected period. Source: PM-16, PM-21.
Still open
25
All records, 01 Oct 2024 to 10 Nov 20265 open, 20 in progress
Breakdown log
Every breakdown from the four plants, newest first. Escalated ones name their escalation; pick it to follow the chain.
182 of 182 breakdowns
Breakdowns from the four plants
S.No
Breakdown ID
Date
Plant
Equipment
From
To
Duration (mins)
Department
Event description
Category
Status
Escalated?
CAPA
Action
1
bd-dl-20261007-02
07 Oct 2026
Ferro Alloy
Furnace 1 Pump
17:50
not recorded
not recorded
Electrical & instr.
F/C 1 Centrifugal pump motor 50HP has dismentalCause: Bearing wear led to overheating
Motor / winding
Closed
–
2
bd-dl-20261003-02
03 Oct 2026
Ferro Alloy
Blower
17:05
not recorded
not recorded
Electrical & instr.
CARIN 2 AUX. HOIST SLIP RING MOTOR ROTER DISMENTALCause: Winding insulation aged
Motor / winding
Closed
–
3
bd-dl-20261001-02
01 Oct 2026
Ferro Alloy
Furnace 3 Transformer
17:45
not recorded
not recorded
Electrical & instr.
F /C 3 transformer oil pump motor startor to be repairCause: Bearing wear led to overheating
Motor / winding
Closed
–
4
bd-dl-20261001-04
01 Oct 2026
Ferro Alloy
Furnace 4 Pump
09:05
not recorded
not recorded
Electrical & instr.
F/C 4 centifigalmotor pump change over to be doneCause: Winding insulation aged
Motor / winding
Closed
–
5
ei-BD-0037
29 Sep 2026
SMS-II E&I
F/C 6A
22:40
22:50
10
Electrical & instr.
trip in GLD.Cause: Earth leakage through damp cable joint
GLD trip
Open
No
–
6
bd-09-K2-2026-09-28
28 Sep 2026
Sponge DRI
Kiln Girth Gear
15:43
16:06
23
Mechanical
Kiln girth gear spring plate no-03 down hill fork cracked.Cause: DUE TO UNEVEN TEMP SHELL & ROOT GAP MINIMISE.
Shaft / gear / bearing
Closed
7
ei-BD-0035
25 Sep 2026
SMS-II E&I
F/C 4B
14:40
14:50
10
Electrical & instr.
Trip due to gldCause: Moisture in GLD sensing circuit
GLD trip
Closed
No
–
8
ei-BD-0036
25 Sep 2026
SMS-II E&I
F/C 6B
21:00
21:20
20
Electrical & instr.
trip due to gldCause: Moisture in GLD sensing circuit
GLD trip
Closed
No
–
9
ei-BD-0034
24 Sep 2026
SMS-II E&I
F/C 5A
17:20
18:20
60
Electrical & instr.
DUE TO INVERTER DIFFERENTIAL CURRENTCause: Lubrication missed
Other
Closed
10
bd-08-K2-2026-09-22
22 Sep 2026
Sponge DRI
Stack cap
22:11
22:40
29
Mechanical
Stack cap hyd hose pipe punture.Cause: Because of entire plant power failure.
Oil / hydraulic
Closed
11
ei-BD-0031
22 Sep 2026
SMS-II E&I
F/C 1A
10:50
10:55
5
Electrical & instr.
off due toElectrical workCause: Wear beyond limit
Other
Closed
No
–
12
ei-BD-0032
22 Sep 2026
SMS-II E&I
F/C 5B
15:30
15:35
5
Electrical & instr.
trip without indicationCause: Operating beyond rated load
Other
Closed
No
–
13
ei-BD-0033
22 Sep 2026
SMS-II E&I
F/C 5B
17:05
17:10
5
Electrical & instr.
off due to insulation falutsCause: Operating beyond rated load
Other
Closed
No
–
14
ei-BD-0027
21 Sep 2026
SMS-II E&I
F/C 1B
10:50
11:00
10
Electrical & instr.
trip in GLDCause: Moisture in GLD sensing circuit
GLD trip
Closed
No
–
15
ei-BD-0028
21 Sep 2026
SMS-II E&I
F/C 1B
10:30
10:50
20
Electrical & instr.
Hold due to Hydrolic power pot problemCause: Operating beyond rated load
Other
Closed
No
–
16
ei-BD-0029
21 Sep 2026
SMS-II E&I
F/C 3B
15:15
15:25
10
Electrical & instr.
trip in GLDCause: Insulation weak at furnace bus
GLD trip
Closed
No
–
17
ei-BD-0030
21 Sep 2026
SMS-II E&I
F/C 6A
10:15
10:30
15
Electrical & instr.
Coil sparkingCause: Cooling water flow low to coil
Coil
Closed
No
–
18
ei-BD-0023
19 Sep 2026
SMS-II E&I
F/C 3A
20:10
20:25
15
Electrical & instr.
Coil sparkingCause: Cooling water flow low to coil
Coil
Closed
No
–
19
ei-BD-0024
19 Sep 2026
SMS-II E&I
F/C 5B
21:55
22:00
5
Electrical & instr.
trip without indicationCause: Loose fitting
Other
Closed
No
–
20
ei-BD-0025
19 Sep 2026
SMS-II E&I
F/C 5B
11:05
11:10
5
Electrical & instr.
trip in GLDCause: Insulation weak at furnace bus
GLD trip
Closed
No
–
21
ei-BD-0026
19 Sep 2026
SMS-II E&I
F/C 6A
06:50
06:55
5
Electrical & instr.
trip in GLDCause: Insulation weak at furnace bus
GLD trip
Closed
No
–
22
ei-BD-0021
16 Sep 2026
SMS-II E&I
F/C 1A
11:40
12:10
30
Electrical & instr.
Coil sparkingCause: Cooling water flow low to coil
Coil
Closed
No
–
23
ei-BD-0022
16 Sep 2026
SMS-II E&I
F/C 5A
22:25
22:30
5
Electrical & instr.
without indicationCause: Lubrication missed
Other
Closed
No
–
24
ei-BD-0019
15 Sep 2026
SMS-II E&I
F/C 1B
15:20
15:40
20
Electrical & instr.
running slow power due to high GLDCause: Moisture in GLD sensing circuit
GLD trip
Closed
No
–
25
ei-BD-0020
15 Sep 2026
SMS-II E&I
F/C 5B
15:05
15:10
5
Electrical & instr.
without indicationCause: Loose fitting
Other
In progress
No
–
Showing 25 of 182
Escalations raised or updated here, and CAPAs generated here: saved in this browser (demo). Nothing is written to the plant's records; "Reset demo data" in the account menu clears them.